Delivery Policy
SGS coordinates slab transport from Jigani with handling protocols designed to reduce breakage and keep finishing intact.
Dispatch timelines
- Dispatch timing is confirmed after slab selection and cutting schedules.
- Local Bangalore deliveries are prioritized for next-available slots.
- Outstation deliveries are planned based on carrier availability and site readiness.
Handling standards
- Slabs are packed with corner protection and secured to reduce impact movement.
- Delivery staff follow lifting and positioning protocols for heavy slabs.
- On-site unloading is aligned with your installer or contractor schedule.
Site readiness
Ensure the site has clear access, a stable unloading zone, and adequate storage protection. SGS will confirm this prior to dispatch.